Novarly ParcelRenewable sites

Renewable sitesSaxley Farm

Saxley Farm

Saxley Farm is operational in Test Valley with a recorded capacity of 5 MW, and has been generating since 2014-03-31.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-31
Solar Photovoltaics
Technology
Solar Century/ Bluefield Solar
Test Valley
Authority
England

Planning and build timeline

Application submitted2013-09-27
Permission granted2013-12-18
3 months after submission
Operational2014-03-31
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Test Valley’s record on solar

Test Valley has decided 37 solar farms and approved 95%, taking a median of 5 months. See every solar farm decision in Test Valley

Other built sites within 15 km

SiteMWDistance
Abbots Ann
Solar Photovoltaics · Operational
71.7 km
Westover Farm
Solar Photovoltaics · Operational
72.1 km
Fullenton Solar Farm
Solar Photovoltaics · Operational
4.25.5 km
Andover Solar Farm
Solar Photovoltaics · Operational
55.6 km
Eveley Farm
Solar Photovoltaics · Operational
496 km
Cowdown Lane
Solar Photovoltaics · Operational
406.6 km
Lains Farm
Solar Photovoltaics · Operational
56.7 km
Shipton Bellinger - Park House Corner Solar Farm
Solar Photovoltaics · Operational
5.49.8 km

How big is Saxley Farm?

Saxley Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Saxley Farm?

REPD records the operator as Solar Century/ Bluefield Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Saxley Farm approved and built?

The application was submitted on 2013-09-27. Permission was granted on 2013-12-18, 3 months later. The site became operational on 2014-03-31, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1333.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council