Lains Farm is operational in Test Valley with a recorded capacity of 5 MW, and has been generating since 2016-03-24.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-24
Solar Photovoltaics
Technology
INRG
Test Valley
Authority
England

Planning and build timeline

Application submitted2014-12-05
Permission granted2015-07-17
7 months after submission
Operational2016-03-24
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Test Valley’s record on solar

Test Valley has decided 37 solar farms and approved 95%, taking a median of 5 months. See every solar farm decision in Test Valley

Other built sites within 15 km

SiteMWDistance
Shipton Bellinger - Park House Corner Solar Farm
Solar Photovoltaics · Operational
5.43.8 km
Parkhouse Corner (Orta Solar)
Solar Photovoltaics · Operational
6.64.5 km
Andover Solar Farm
Solar Photovoltaics · Operational
55.4 km
Saxley Farm
Solar Photovoltaics · Operational
56.7 km
Abbots Ann
Solar Photovoltaics · Operational
78 km
Westover Farm
Solar Photovoltaics · Operational
78.4 km
Hatherden Farm
Solar Photovoltaics · Operational
49.99 km
Boscombe Airfield
Solar Photovoltaics · Operational
12.310.3 km

How big is Lains Farm?

Lains Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lains Farm?

REPD records the operator as INRG. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lains Farm approved and built?

The application was submitted on 2014-12-05. Permission was granted on 2015-07-17, 7 months later. The site became operational on 2016-03-24, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1840.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council