Renewable sites › Energen biogas Cumbernauld
Energen biogas Cumbernauld
Energen biogas Cumbernauld is an operational 2.4 MW anaerobic digestion plant in North Lanarkshire, generating since 22 June 2011. Planning permission was granted on 5 November 2008, 2 months after submission. Operator of record: Bio Capital Limited.
Planning and build timeline
| Application submitted | 17 September 2008 |
| Permission granted | 5 November 2008 2 months after submission |
| Operational | 22 June 2011 32 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in North Lanarkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Energen biogas Cumbernauld’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 1 | 0.1 km |
Anaerobic Digestion · Operational | 2.4 | 0.1 km |
Landfill Gas · Operational | 2.2 | 7.2 km |
Landfill Gas · Operational | 2 | 7.2 km |
Landfill Gas · Operational | 2 | 7.2 km |
Landfill Gas · Operational | 1.9 | 7.2 km |
Landfill Gas · Operational | 4 | 7.2 km |
Landfill Gas · Operational | 2.2 | 7.2 km |
How big is Energen biogas Cumbernauld?
Energen biogas Cumbernauld has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Energen biogas Cumbernauld?
REPD records the operator as Bio Capital Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Energen biogas Cumbernauld approved and built?
The application was submitted on 17 September 2008. Permission was granted on 5 November 2008, 2 months later. The site became operational on 22 June 2011, 32 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 231.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode