Deerdykes Composting and Organics Recycling Facility (Waste AD)

Deerdykes Composting and Organics Recycling Facility (Waste AD) is an operational 1 MW anaerobic digestion plant in North Lanarkshire, generating since 28 September 2010. REPD does not record the planning grant date. Operator of record: Scottish Water Solutions.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 28 September 2010
Anaerobic Digestion
Technology
Scottish Water Solutions
North Lanarkshire
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational28 September 2010

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Lanarkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Deerdykes Composting and Organics Recycling Facility (Waste AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
2.40 km
Anaerobic Digestion · Operational
2.40.1 km
Landfill Gas · Operational
2.27.3 km
Landfill Gas · Operational
27.3 km
Landfill Gas · Operational
27.3 km
Landfill Gas · Operational
1.97.3 km
Landfill Gas · Operational
47.3 km
Landfill Gas · Operational
2.27.3 km

How big is Deerdykes Composting and Organics Recycling Facility (Waste AD)?

Deerdykes Composting and Organics Recycling Facility (Waste AD) has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Deerdykes Composting and Organics Recycling Facility (Waste AD)?

REPD records the operator as Scottish Water Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Deerdykes Composting and Organics Recycling Facility (Waste AD) approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 28 September 2010.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 210.