Deerdykes Composting and Organics Recycling Facility (Waste AD) is operational in North Lanarkshire with a recorded capacity of 1 MW, and has been generating since 2010-09-28.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2010-09-28 |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Cumbernauld BioPlant (Waste AD) Anaerobic Digestion · Operational | 2.4 | 0 km |
Energen biogas Cumbernauld Anaerobic Digestion · Operational | 2.4 | 0.1 km |
Greengairs Landfill Scheme Phase III Landfill Gas · Operational | 2 | 7.3 km |
Greengairs Landfill Scheme Phase VI Landfill Gas · Operational | 2.2 | 7.3 km |
Greengairs Landfill Scheme Phase II Landfill Gas · Operational | 1.9 | 7.3 km |
Greengairs Landfill Scheme Phase IV Landfill Gas · Operational | 2 | 7.3 km |
Avondale Landfill Gas · Operational | 4 | 7.3 km |
Greengairs Landfill Scheme Phase V Landfill Gas · Operational | 2.2 | 7.3 km |
How big is Deerdykes Composting and Organics Recycling Facility (Waste AD)?
Deerdykes Composting and Organics Recycling Facility (Waste AD) has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Deerdykes Composting and Organics Recycling Facility (Waste AD)?
REPD records the operator as Scottish Water Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Deerdykes Composting and Organics Recycling Facility (Waste AD) approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2010-09-28.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 210.