Culmhead Solar Farm

Culmhead Solar Farm is operational in Somerset with a recorded capacity of 7.5 MW, and has been generating since 2014-01-26.

7.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-01-26
Solar Photovoltaics
Technology
Anesco
Somerset
Authority
England

Planning and build timeline

Application submitted2012-09-11
Permission granted2012-10-19
1 months after submission
Operational2014-01-26
15 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Somerset’s record on solar

Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset

Other built sites within 15 km

SiteMWDistance
Trickey Warren
Solar Photovoltaics · Operational
4.80.7 km
Taunton Racecourse
Solar Photovoltaics · Operational
1.58.1 km
Poole Generation Plant
Landfill Gas · Operational
2.48.9 km
Dunkeswell Airfield
Solar Photovoltaics · Operational
29.8 km
Wellington Sports Centre, Corams Lane - Solar Panels
Solar Photovoltaics · Under Construction
0.179.9 km
Tonedale Farm
Solar Photovoltaics · Operational
510.3 km
New Rendy Farm
Solar Photovoltaics · Operational
4.810.4 km
Fideoak Mills
Battery · Operational
3010.6 km

How big is Culmhead Solar Farm?

Culmhead Solar Farm has a recorded installed capacity of 7.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Culmhead Solar Farm?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Culmhead Solar Farm approved and built?

The application was submitted on 2012-09-11. Permission was granted on 2012-10-19, 1 months later. The site became operational on 2014-01-26, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1603.