Wellington Sports Centre, Corams Lane - Solar Panels

Wellington Sports Centre, Corams Lane - Solar Panels is under construction in Somerset with a recorded capacity of 0.17 MW.

0.17 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Somerset County Council
Somerset
Authority
England

Planning and build timeline

Application submitted2023-08-18
Permission granted2023-09-26
1 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Somerset’s record on solar

Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset

Other built sites within 15 km

SiteMWDistance
Tonedale Farm
Solar Photovoltaics · Operational
50.7 km
Poole Generation Plant
Landfill Gas · Operational
2.42.2 km
Grange Farm Solar Farm
Solar Photovoltaics · Operational
4.93 km
New Rendy Farm
Solar Photovoltaics · Operational
4.84 km
Red Hill Farm
Solar Photovoltaics · Operational
4.85.4 km
Barton Solar Farm
Solar Photovoltaics · Operational
1.26.6 km
Fideoak Mills
Battery · Operational
307.3 km
Montys Farm
Solar Photovoltaics · Operational
57.6 km

How big is Wellington Sports Centre, Corams Lane - Solar Panels?

Wellington Sports Centre, Corams Lane - Solar Panels has a recorded installed capacity of 0.17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wellington Sports Centre, Corams Lane - Solar Panels?

REPD records the operator as Somerset County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wellington Sports Centre, Corams Lane - Solar Panels approved and built?

The application was submitted on 2023-08-18. Permission was granted on 2023-09-26, 1 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14748.