Wellington Sports Centre, Corams Lane - Solar Panels is under construction in Somerset with a recorded capacity of 0.17 MW.
Planning and build timeline
| Application submitted | 2023-08-18 |
| Permission granted | 2023-09-26 1 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Nutrient-neutrality catchment — Tone Catchment
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Somerset’s record on solar
Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tonedale Farm Solar Photovoltaics · Operational | 5 | 0.7 km |
Poole Generation Plant Landfill Gas · Operational | 2.4 | 2.2 km |
Grange Farm Solar Farm Solar Photovoltaics · Operational | 4.9 | 3 km |
New Rendy Farm Solar Photovoltaics · Operational | 4.8 | 4 km |
Red Hill Farm Solar Photovoltaics · Operational | 4.8 | 5.4 km |
Barton Solar Farm Solar Photovoltaics · Operational | 1.2 | 6.6 km |
Fideoak Mills Battery · Operational | 30 | 7.3 km |
Montys Farm Solar Photovoltaics · Operational | 5 | 7.6 km |
How big is Wellington Sports Centre, Corams Lane - Solar Panels?
Wellington Sports Centre, Corams Lane - Solar Panels has a recorded installed capacity of 0.17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Wellington Sports Centre, Corams Lane - Solar Panels?
REPD records the operator as Somerset County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Wellington Sports Centre, Corams Lane - Solar Panels approved and built?
The application was submitted on 2023-08-18. Permission was granted on 2023-09-26, 1 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14748.