Novarly ParcelRenewable sites

Renewable sitesCoventry

Coventry

Coventry is operational in Coventry with a recorded capacity of 4.5 MW, and has been generating since 2001-09-28.

4.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2001-09-28
EfW Incineration
Technology
Coventry & Solihull WDC
Coventry
Authority
England

Planning and build timeline

Application submitted1998-06-15
Permission granted1998-11-16
5 months after submission
Operational2001-09-28
34 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Waverley Wood II
Landfill Gas · Operational
2.46.5 km
Coventry National Grid Substation
Battery · Operational
49.96.7 km
Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels
Solar Photovoltaics · Under Construction
257.4 km
Little Beanit Farm, Balsall Common - Battery Storage
Battery · Under Construction
2009.2 km
Ling Hall
Solar Photovoltaics · Operational
710.6 km
Ling Hall 1
Landfill Gas · Operational
311.3 km
Symmetry Park Energy Centre
Battery · Under Construction
13.1 km
Land South of Pogmore Spinney
Solar Photovoltaics · Operational
513.5 km

How big is Coventry?

Coventry has a recorded installed capacity of 4.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Coventry?

REPD records the operator as Coventry & Solihull WDC. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Coventry approved and built?

The application was submitted on 1998-06-15. Permission was granted on 1998-11-16, 5 months later. The site became operational on 2001-09-28, 34 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 895.