Coventry is an operational 4.5 MW energy-from-waste plant in Coventry, generating since 28 September 2001. Planning permission was granted on 16 November 1998, 5 months after submission. Operator of record: Coventry & Solihull WDC.

4.5 MW
Capacity
as recorded in REPD
Operational
Status
since 28 September 2001
EfW Incineration
Technology
Coventry & Solihull WDC
Coventry
Authority
England

Planning and build timeline

Application submitted15 June 1998
Permission granted16 November 1998
5 months after submission
Operational28 September 2001
34 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Coventry: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Coventry’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.46.5 km
Battery · Operational
49.96.7 km
Solar Photovoltaics · Under Construction
257.4 km
Battery · Under Construction
2009.2 km
Solar Photovoltaics · Operational
710.6 km
Landfill Gas · Operational
311.3 km
Battery · Under Construction
13.1 km
Solar Photovoltaics · Operational
513.5 km

How big is Coventry?

Coventry has a recorded installed capacity of 4.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Coventry?

REPD records the operator as Coventry & Solihull WDC. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Coventry approved and built?

The application was submitted on 15 June 1998. Permission was granted on 16 November 1998, 5 months later. The site became operational on 28 September 2001, 34 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 895.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode