Novarly ParcelRenewable sites

Renewable sitesCourt Farm Business Park, Road To Court Farm - Hydroelectric System

Court Farm Business Park, Road To Court Farm - Hydroelectric System

Court Farm Business Park, Road To Court Farm - Hydroelectric System is an operational 10 MW hydro scheme in Dorset, generating since 1 April 2013. REPD does not record the planning grant date. Operator of record: Court Farm Business Park.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 1 April 2013
Large Hydro
Technology
Court Farm Business Park
Dorset
Authority
England

Planning and build timeline

Application submitted13 December 2024
Permission grantednot recorded
Operational1 April 2013

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Dorset: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Court Farm Business Park, Road To Court Farm - Hydroelectric System’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
97.9 km
Solar Photovoltaics · Operational
57.9 km
Solar Photovoltaics · Operational
58.1 km
Anaerobic Digestion · Operational
1.18.2 km
Solar Photovoltaics · Operational
2.48.3 km
Anaerobic Digestion · Operational
1.311.2 km
Solar Photovoltaics · Operational
6.711.6 km
Solar Photovoltaics · Operational
1.512.4 km

How big is Court Farm Business Park, Road To Court Farm - Hydroelectric System?

Court Farm Business Park, Road To Court Farm - Hydroelectric System has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Court Farm Business Park, Road To Court Farm - Hydroelectric System?

REPD records the operator as Court Farm Business Park. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Court Farm Business Park, Road To Court Farm - Hydroelectric System approved and built?

The application was submitted on 13 December 2024. REPD does not record a grant date. The site became operational on 1 April 2013.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 17875.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode