Lowbrook Farm Anaerobic Digester (Farm AD) is operational in Dorset with a recorded capacity of 1.3 MW, and has been generating since 2006-06-26.

1.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2006-06-26
Anaerobic Digestion
Technology
Biogas Nord
Dorset
Authority
England

Planning and build timeline

Application submitted2006-04-12
Permission granted2006-06-06
2 months after submission
Operational2006-06-26
1 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Rudge Hill Farm
Solar Photovoltaics · Operational
1.53.4 km
Canada Farm
Solar Photovoltaics · Operational
8.37.3 km
Park Farm
Solar Photovoltaics · Operational
48.2 km
Littleton
Solar Photovoltaics · Operational
12.110.4 km
Court Farm Business Park, Road To Court Farm - Hydroelectric System
Large Hydro · Operational
1011.2 km
Land at Stalbridge Park
Solar Photovoltaics · Operational
511.4 km
North Farm (Spetisbury)
Solar Photovoltaics · Operational
11.611.8 km
Bourne Park (Solar)
Solar Photovoltaics · Operational
513.4 km

How big is Lowbrook Farm Anaerobic Digester (Farm AD)?

Lowbrook Farm Anaerobic Digester (Farm AD) has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lowbrook Farm Anaerobic Digester (Farm AD)?

REPD records the operator as Biogas Nord. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lowbrook Farm Anaerobic Digester (Farm AD) approved and built?

The application was submitted on 2006-04-12. Permission was granted on 2006-06-06, 2 months later. The site became operational on 2006-06-26, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 235.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council