Novarly ParcelRenewable sites

Renewable sitesContinental Approach - Solar Panels

Continental Approach - Solar Panels

Continental Approach - Solar Panels is operational in Thanet with a recorded capacity of 0.2 MW, and has been generating since 2021-08-01.

0.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-08-01
Solar Photovoltaics
Technology
Roe Timber Frame Limited
Thanet
Authority
England

Planning and build timeline

Application submitted2021-06-04
Permission granted2021-11-04
5 months after submission
Operational2021-08-01

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Thanet’s record on solar

Thanet has decided 20 solar farms and approved 95%, taking a median of 2.3 months. See every solar farm decision in Thanet

Other built sites within 15 km

SiteMWDistance
Queen Elizabeth The Queen Mothers Hospital
Solar Photovoltaics · Operational
0.41.2 km
Manston Solar Farm extension (Westwood)
Solar Photovoltaics · Operational
9.22 km
Manston Solar Farm
Solar Photovoltaics · Operational
9.92.3 km
Thorne Farm
Solar Photovoltaics · Operational
6.24.3 km
Minster Abbey, Bedlam Court Lane - Solar PV panels
Solar Photovoltaics · Under Construction
336.4 km
Ebbsfleet Farm Solar Farm
Solar Photovoltaics · Operational
4.96.5 km
Richborough Energy Park - Phase 3 (Sheaf)
Battery · Under Construction
2496.8 km
Richborough Energy Park - Phase 2
Battery · Operational
50.16.9 km

How big is Continental Approach - Solar Panels?

Continental Approach - Solar Panels has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Continental Approach - Solar Panels?

REPD records the operator as Roe Timber Frame Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Continental Approach - Solar Panels approved and built?

The application was submitted on 2021-06-04. Permission was granted on 2021-11-04, 5 months later. The site became operational on 2021-08-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9198.