Novarly ParcelRenewable sites

Renewable sitesContinental Approach - Solar Panels

Continental Approach - Solar Panels

Continental Approach - Solar Panels is an operational 0.2 MW solar farm in Thanet, generating since 1 August 2021. Planning permission was granted on 4 November 2021, 5 months after submission. Operator of record: Roe Timber Frame Limited.

0.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 August 2021
Solar Photovoltaics
Technology
Roe Timber Frame Limited
Thanet
Authority
England

Planning and build timeline

Application submitted4 June 2021
Permission granted4 November 2021
5 months after submission
Operational1 August 2021

Screening a site of your own?

RedlineUK · £39

Thanet approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Continental Approach - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Thanet’s record on solar

Thanet has decided 20 solar farms and approved 95%, taking a median of 2.3 months. See every solar farm decision in Thanet

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.41.2 km
Solar Photovoltaics · Operational
9.22 km
Solar Photovoltaics · Operational
9.92.3 km
Solar Photovoltaics · Operational
6.24.3 km
Solar Photovoltaics · Under Construction
336.4 km
Solar Photovoltaics · Operational
4.96.5 km
Battery · Under Construction
2496.8 km
Battery · Operational
49.96.9 km

How big is Continental Approach - Solar Panels?

Continental Approach - Solar Panels has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Continental Approach - Solar Panels?

REPD records the operator as Roe Timber Frame Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Continental Approach - Solar Panels approved and built?

The application was submitted on 4 June 2021. Permission was granted on 4 November 2021, 5 months later. The site became operational on 1 August 2021.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9198.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode