Renewable sites › Continental Approach - Solar Panels
Continental Approach - Solar Panels
Continental Approach - Solar Panels is operational in Thanet with a recorded capacity of 0.2 MW, and has been generating since 2021-08-01.
Planning and build timeline
| Application submitted | 2021-06-04 |
| Permission granted | 2021-11-04 5 months after submission |
| Operational | 2021-08-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Thanet’s record on solar
Thanet has decided 20 solar farms and approved 95%, taking a median of 2.3 months. See every solar farm decision in Thanet →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Queen Elizabeth The Queen Mothers Hospital Solar Photovoltaics · Operational | 0.4 | 1.2 km |
Manston Solar Farm extension (Westwood) Solar Photovoltaics · Operational | 9.2 | 2 km |
Manston Solar Farm Solar Photovoltaics · Operational | 9.9 | 2.3 km |
Thorne Farm Solar Photovoltaics · Operational | 6.2 | 4.3 km |
Minster Abbey, Bedlam Court Lane - Solar PV panels Solar Photovoltaics · Under Construction | 33 | 6.4 km |
Ebbsfleet Farm Solar Farm Solar Photovoltaics · Operational | 4.9 | 6.5 km |
Richborough Energy Park - Phase 3 (Sheaf) Battery · Under Construction | 249 | 6.8 km |
Richborough Energy Park - Phase 2 Battery · Operational | 50.1 | 6.9 km |
How big is Continental Approach - Solar Panels?
Continental Approach - Solar Panels has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Continental Approach - Solar Panels?
REPD records the operator as Roe Timber Frame Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Continental Approach - Solar Panels approved and built?
The application was submitted on 2021-06-04. Permission was granted on 2021-11-04, 5 months later. The site became operational on 2021-08-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9198.