Renewable sitesCombermere Abbey

Combermere Abbey

Combermere Abbey is operational in Cheshire East with a recorded capacity of 14 MW, and has been generating since 2015-03-29.

14 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-29
Solar Photovoltaics
Technology
INRG Solar
Cheshire East
Authority
England

Planning and build timeline

Application submitted2014-05-22
Permission granted2014-12-01
6 months after submission
Operational2015-03-29
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cheshire East’s record on solar

Cheshire East has decided 36 solar farms and approved 94%, taking a median of 1.8 months. See every solar farm decision in Cheshire East

Other built sites within 15 km

SiteMWDistance
Broughall Fields Farm
Anaerobic Digestion · Operational
2.46 km
Twemlows
Solar Photovoltaics · Operational
107.5 km
Belton Farm, Belton - Solar Pv System
Solar Photovoltaics · Under Construction
2.188.3 km
Fields Farm (Agden)
Solar Photovoltaics · Operational
58.6 km
Bubney Farm
Solar Photovoltaics · Operational
409.1 km
Bubney Farm
Battery · Operational
9.1 km
Hadley Solar Farm
Solar Photovoltaics · Operational
6.69.6 km
Land To The North Of Dairy House Farm
Solar Photovoltaics · Operational
3.413 km

How big is Combermere Abbey?

Combermere Abbey has a recorded installed capacity of 14 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Combermere Abbey?

REPD records the operator as INRG Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Combermere Abbey approved and built?

The application was submitted on 2014-05-22. Permission was granted on 2014-12-01, 6 months later. The site became operational on 2015-03-29, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1478.