Combermere Abbey
Combermere Abbey is operational in Cheshire East with a recorded capacity of 14 MW, and has been generating since 2015-03-29.
Planning and build timeline
| Application submitted | 2014-05-22 |
| Permission granted | 2014-12-01 6 months after submission |
| Operational | 2015-03-29 4 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cheshire East’s record on solar
Cheshire East has decided 36 solar farms and approved 94%, taking a median of 1.8 months. See every solar farm decision in Cheshire East →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Broughall Fields Farm Anaerobic Digestion · Operational | 2.4 | 6 km |
Twemlows Solar Photovoltaics · Operational | 10 | 7.5 km |
Belton Farm, Belton - Solar Pv System Solar Photovoltaics · Under Construction | 2.18 | 8.3 km |
Fields Farm (Agden) Solar Photovoltaics · Operational | 5 | 8.6 km |
Bubney Farm Solar Photovoltaics · Operational | 40 | 9.1 km |
Bubney Farm Battery · Operational | — | 9.1 km |
Hadley Solar Farm Solar Photovoltaics · Operational | 6.6 | 9.6 km |
Land To The North Of Dairy House Farm Solar Photovoltaics · Operational | 3.4 | 13 km |
How big is Combermere Abbey?
Combermere Abbey has a recorded installed capacity of 14 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Combermere Abbey?
REPD records the operator as INRG Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Combermere Abbey approved and built?
The application was submitted on 2014-05-22. Permission was granted on 2014-12-01, 6 months later. The site became operational on 2015-03-29, 4 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1478.