Renewable sites › Belton Farm, Belton - Solar Pv System
Belton Farm, Belton - Solar Pv System
Belton Farm, Belton - Solar Pv System is a 2.18 MW solar farm under construction in Shropshire. Planning permission was granted on 3 April 2024, 4 months after submission. Operator of record: Conrad Energy (Developments) Limited.
Planning and build timeline
| Application submitted | 29 November 2023 |
| Permission granted | 3 April 2024 4 months after submission |
| Operational | not recorded |
Screening a site of your own?
Shropshire approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Belton Farm, Belton - Solar Pv System’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Shropshire’s record on solar
Shropshire has decided 68 solar farms and approved 94%, taking a median of 3.2 months. See every solar farm decision in Shropshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 6.6 | 1.4 km |
Battery · Operational | — | 2.3 km |
Solar Photovoltaics · Operational | 40 | 2.3 km |
Anaerobic Digestion · Operational | 2.4 | 2.7 km |
Solar Photovoltaics · Operational | 5 | 4.1 km |
Solar Photovoltaics · Operational | 10 | 4.7 km |
Solar Photovoltaics · Operational | 14 | 8.3 km |
Solar Photovoltaics · Operational | 7.2 | 14.6 km |
How big is Belton Farm, Belton - Solar Pv System?
Belton Farm, Belton - Solar Pv System has a recorded installed capacity of 2.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Belton Farm, Belton - Solar Pv System?
REPD records the operator as Conrad Energy (Developments) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Belton Farm, Belton - Solar Pv System approved and built?
The application was submitted on 29 November 2023. Permission was granted on 3 April 2024, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15591.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode