Renewable sites › Belton Farm, Belton - Solar Pv System
Belton Farm, Belton - Solar Pv System
Belton Farm, Belton - Solar Pv System is under construction in Shropshire with a recorded capacity of 2.18 MW.
Planning and build timeline
| Application submitted | 2023-11-29 |
| Permission granted | 2024-04-03 4 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Shropshire’s record on solar
Shropshire has decided 68 solar farms and approved 94%, taking a median of 3.2 months. See every solar farm decision in Shropshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hadley Solar Farm Solar Photovoltaics · Operational | 6.6 | 1.4 km |
Bubney Farm Solar Photovoltaics · Operational | 40 | 2.3 km |
Bubney Farm Battery · Operational | — | 2.3 km |
Broughall Fields Farm Anaerobic Digestion · Operational | 2.4 | 2.7 km |
Fields Farm (Agden) Solar Photovoltaics · Operational | 5 | 4.1 km |
Twemlows Solar Photovoltaics · Operational | 10 | 4.7 km |
Combermere Abbey Solar Photovoltaics · Operational | 14 | 8.3 km |
Trench Farm Solar Photovoltaics · Operational | 7.2 | 14.6 km |
How big is Belton Farm, Belton - Solar Pv System?
Belton Farm, Belton - Solar Pv System has a recorded installed capacity of 2.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Belton Farm, Belton - Solar Pv System?
REPD records the operator as Conrad Energy (Developments) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Belton Farm, Belton - Solar Pv System approved and built?
The application was submitted on 2023-11-29. Permission was granted on 2024-04-03, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15591.
Novarly Parcel · official public data, read properly · parcel.novarly.com