Bubney Farm

Bubney Farm is operational in Shropshire, and has been generating since 2023-03-28.

Capacity
as recorded in REPD
Operational
Status
since 2023-03-28
Battery
Technology
AlphaReal
Shropshire
Authority
England

Planning and build timeline

Application submitted2021-04-01
Permission granted2021-10-01
6 months after submission
Operational2023-03-28
18 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Shropshire’s record on battery storage

Shropshire has decided 15 battery storage schemes and approved 100%, taking a median of 3.8 months. See every battery storage scheme decision in Shropshire

Other built sites within 15 km

SiteMWDistance
Bubney Farm
Solar Photovoltaics · Operational
400 km
Hadley Solar Farm
Solar Photovoltaics · Operational
6.61.7 km
Fields Farm (Agden)
Solar Photovoltaics · Operational
52.2 km
Belton Farm, Belton - Solar Pv System
Solar Photovoltaics · Under Construction
2.182.3 km
Broughall Fields Farm
Anaerobic Digestion · Operational
2.44.5 km
Twemlows
Solar Photovoltaics · Operational
107 km
Combermere Abbey
Solar Photovoltaics · Operational
149.1 km
Trench Farm
Solar Photovoltaics · Operational
7.213.3 km

How big is Bubney Farm?

REPD does not record an installed capacity for Bubney Farm.

Who operates Bubney Farm?

REPD records the operator as AlphaReal. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bubney Farm approved and built?

The application was submitted on 2021-04-01. Permission was granted on 2021-10-01, 6 months later. The site became operational on 2023-03-28, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8147.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council