Fields Farm (Agden)

Fields Farm (Agden) is operational in Cheshire West and Chester with a recorded capacity of 5 MW, and has been generating since 2017-02-09.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-02-09
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Cheshire West and Chester
Authority
England

Planning and build timeline

Application submitted2015-07-23
Permission granted2016-02-10
7 months after submission
Operational2017-02-09
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cheshire West and Chester’s record on solar

Cheshire West and Chester has decided 39 solar farms and approved 95%, taking a median of 1.7 months. See every solar farm decision in Cheshire West and Chester

Other built sites within 15 km

SiteMWDistance
Bubney Farm
Solar Photovoltaics · Operational
402.2 km
Bubney Farm
Battery · Operational
2.2 km
Hadley Solar Farm
Solar Photovoltaics · Operational
6.63.9 km
Belton Farm, Belton - Solar Pv System
Solar Photovoltaics · Under Construction
2.184.1 km
Broughall Fields Farm
Anaerobic Digestion · Operational
2.45.6 km
Twemlows
Solar Photovoltaics · Operational
108.4 km
Combermere Abbey
Solar Photovoltaics · Operational
148.6 km
Williams Farm
Solar Photovoltaics · Operational
513.7 km

How big is Fields Farm (Agden)?

Fields Farm (Agden) has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fields Farm (Agden)?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fields Farm (Agden) approved and built?

The application was submitted on 2015-07-23. Permission was granted on 2016-02-10, 7 months later. The site became operational on 2017-02-09, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5529.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council