Clayhill Farm - Battery Energy Storage

Clayhill Farm - Battery Energy Storage is an operational 21 MW battery storage site in Central Bedfordshire, generating since 1 October 2019. Planning permission was granted on 23 March 2018, 3 months after submission. Operator of record: Enso Energy Limited.

21 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2019
Battery
Technology
Enso Energy Limited
Central Bedfordshire
Authority
England

Planning and build timeline

Application submitted19 December 2017
Permission granted23 March 2018
3 months after submission
Operational1 October 2019
18 months after consent

Screening a site of your own?

RedlineUK · £39

Central Bedfordshire approves 94% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Clayhill Farm - Battery Energy Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Central Bedfordshire’s record on battery storage

Central Bedfordshire has decided 17 battery storage schemes and approved 94%, taking a median of 6 months. See every battery storage scheme decision in Central Bedfordshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
100.6 km
Battery · Operational
60.6 km
Landfill Gas · Operational
2.64.7 km
Battery · Operational
49.96.1 km
Battery · Operational
49.56.7 km
Biomass (dedicated) · Operational
168.4 km
Anaerobic Digestion · Operational
1.19 km
Solar Photovoltaics · Under Construction
9.3 km

How big is Clayhill Farm - Battery Energy Storage?

Clayhill Farm - Battery Energy Storage has a recorded installed capacity of 21 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Clayhill Farm - Battery Energy Storage?

REPD records the operator as Enso Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Clayhill Farm - Battery Energy Storage approved and built?

The application was submitted on 19 December 2017. Permission was granted on 23 March 2018, 3 months later. The site became operational on 1 October 2019, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7570.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode