Renewable sites › Tebworth - Solar Farm
Tebworth - Solar Farm
Tebworth - Solar Farm is under construction in Central Bedfordshire.
Planning and build timeline
| Application submitted | 2021-09-20 |
| Permission granted | 2022-05-30 8 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Central Bedfordshire
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Central Bedfordshire’s record on solar
Central Bedfordshire has decided 32 solar farms and approved 97%, taking a median of 3.2 months. See every solar farm decision in Central Bedfordshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tebworth - Battery Storage Battery · Under Construction | — | 0 km |
Trinity Hall Farm Anaerobic Digestion · Operational | 1.1 | 0.9 km |
Trinity Hall Solar Farm Solar Photovoltaics · Under Construction | 15 | 0.9 km |
Manor Farm Solar Photovoltaics · Operational | 5 | 2.4 km |
Double Arches Quarry Wind Turbine Wind Onshore · Operational | 1.5 | 5.2 km |
Checkley Wood Farm Wind Onshore · Operational | 4.1 | 5.3 km |
Chapel Farm Battery · Operational | 49.5 | 5.4 km |
Sundon Substation Battery · Operational | 49.9 | 5.5 km |
How big is Tebworth - Solar Farm?
REPD does not record an installed capacity for Tebworth - Solar Farm.
Who operates Tebworth - Solar Farm?
REPD records the operator as Sundon Green Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tebworth - Solar Farm approved and built?
The application was submitted on 2021-09-20. Permission was granted on 2022-05-30, 8 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8894.
Novarly Parcel · official public data, read properly · parcel.novarly.com