Trinity Hall Farm
Trinity Hall Farm is an operational 1.1 MW anaerobic digestion plant in Central Bedfordshire, generating since 1 November 2012. Planning permission was granted on 2 March 2011, 6 months after submission. Operator of record: Hallwick Energy.
Planning and build timeline
| Application submitted | 15 September 2010 |
| Permission granted | 2 March 2011 6 months after submission |
| Operational | 1 November 2012 20 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Central Bedfordshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Trinity Hall Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Central Bedfordshire
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Under Construction | — | 0.9 km |
Solar Photovoltaics · Under Construction | — | 0.9 km |
Solar Photovoltaics · Under Construction | 15 | 1.6 km |
Solar Photovoltaics · Operational | 5 | 3.3 km |
Battery · Operational | 49.5 | 4.6 km |
Battery · Operational | 49.9 | 4.8 km |
Landfill Gas · Operational | 2.6 | 5.8 km |
Wind Onshore · Operational | 1.5 | 6 km |
How big is Trinity Hall Farm?
Trinity Hall Farm has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Trinity Hall Farm?
REPD records the operator as Hallwick Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Trinity Hall Farm approved and built?
The application was submitted on 15 September 2010. Permission was granted on 2 March 2011, 6 months later. The site became operational on 1 November 2012, 20 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 240.