Renewable sitesChurch Hill

Church Hill

Church Hill is an operational 18.4 MW onshore wind farm in Derry City and Strabane, generating since 1 June 2012. Planning permission was granted on 26 April 2007, 25 months after submission. Operator of record: Greencoat (formerly Energia Renewables).

18.4 MW
Capacity
as recorded in REPD
Operational
Status
since 1 June 2012
Wind Onshore
Technology
Greencoat (formerly Energia Renewables)
Derry City and Strabane
Authority
Northern Ireland

Planning and build timeline

Application submitted6 April 2005
Permission granted26 April 2007
25 months after submission
Operational1 June 2012
61 months after consent

Screening a site of your own?

RedlineUK · £39

Derry City and Strabane approves 79% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Church Hill’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Derry City and Strabane’s record on onshore wind

Derry City and Strabane has decided 42 onshore wind schemes and approved 79%, taking a median of 29.1 months. See every onshore wind scheme decision in Derry City and Strabane

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
32.23 km
Wind Onshore · Operational
97.1 km
Wind Onshore · Operational
10.57.3 km
Wind Onshore · Operational
258.5 km
Wind Onshore · Operational
6.99.5 km
Wind Onshore · Operational
34.59.7 km
Wind Onshore · Operational
9.211.2 km
Wind Onshore · Operational
9.211.2 km

How big is Church Hill?

Church Hill has a recorded installed capacity of 18.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Church Hill?

REPD records the operator as Greencoat (formerly Energia Renewables). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Church Hill approved and built?

The application was submitted on 6 April 2005. Permission was granted on 26 April 2007, 25 months later. The site became operational on 1 June 2012, 61 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4047.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode