Novarly ParcelRenewable sites

Renewable sitesCaton Moor Windfarm Repowering

Caton Moor Windfarm Repowering

Caton Moor Windfarm Repowering is an operational 16 MW onshore wind farm in Lancaster, generating since 1 June 2006. Planning permission was granted on 1 October 2004, 23 months after submission. Operator of record: Hainsford Energy.

16 MW
Capacity
as recorded in REPD
Operational
Status
since 1 June 2006
Wind Onshore
Technology
Hainsford Energy
Lancaster
Authority
England

Planning and build timeline

Application submitted7 November 2002
Permission granted1 October 2004
23 months after submission
Operational1 June 2006
20 months after consent

Screening a site of your own?

RedlineUK · £39

Lancaster approves 80% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Caton Moor Windfarm Repowering’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Lancaster’s record on onshore wind

Lancaster has decided 5 onshore wind schemes and approved 80%, taking a median of 9.9 months. See every onshore wind scheme decision in Lancaster

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
59.5 km
Solar Photovoltaics · Under Construction
16.510.4 km
Wind Onshore · Operational
210.8 km
Landfill Gas · Operational
411.9 km
Landfill Gas · Operational
211.9 km
Solar Photovoltaics · Operational
1.212 km
Solar Photovoltaics · Operational
6.212.3 km
Wind Onshore · Operational
7.514.4 km

How big is Caton Moor Windfarm Repowering?

Caton Moor Windfarm Repowering has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Caton Moor Windfarm Repowering?

REPD records the operator as Hainsford Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Caton Moor Windfarm Repowering approved and built?

The application was submitted on 7 November 2002. Permission was granted on 1 October 2004, 23 months later. The site became operational on 1 June 2006, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3171.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode