Renewable sitesCaton Moor Windfarm Repowering

Caton Moor Windfarm Repowering

Caton Moor Windfarm Repowering is operational in Lancaster with a recorded capacity of 16 MW, and has been generating since 2006-06-01.

16 MW
Capacity
as recorded in REPD
Operational
Status
since 2006-06-01
Wind Onshore
Technology
Hainsford Energy
Lancaster
Authority
England

Planning and build timeline

Application submitted2002-11-07
Permission granted2004-10-01
23 months after submission
Operational2006-06-01
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Lancaster’s record on onshore wind

Lancaster has decided 5 onshore wind schemes and approved 80%, taking a median of 9.9 months. See every onshore wind scheme decision in Lancaster

Other built sites within 15 km

SiteMWDistance
Ravens Close
Solar Photovoltaics · Operational
59.5 km
Hazelrigg Lane, Scotforth - Solar Farm
Solar Photovoltaics · Under Construction
16.510.4 km
Lancaster University (wind)
Wind Onshore · Operational
210.8 km
Lune Power
Landfill Gas · Operational
211.9 km
Salt Ayre
Landfill Gas · Operational
411.9 km
Lancaster Wastewater Treatment Works
Solar Photovoltaics · Operational
1.212 km
Arna Wood Solar
Solar Photovoltaics · Operational
6.212.3 km
Heysham South Wind Farm
Wind Onshore · Operational
7.514.4 km

How big is Caton Moor Windfarm Repowering?

Caton Moor Windfarm Repowering has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Caton Moor Windfarm Repowering?

REPD records the operator as Hainsford Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Caton Moor Windfarm Repowering approved and built?

The application was submitted on 2002-11-07. Permission was granted on 2004-10-01, 23 months later. The site became operational on 2006-06-01, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3171.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council