Novarly ParcelRenewable sites

Renewable sitesHeysham South Wind Farm

Heysham South Wind Farm

Heysham South Wind Farm is an operational 7.5 MW onshore wind farm in Lancaster, generating since 24 April 2015. Planning permission was granted on 28 November 2012, 16 months after submission. Operator of record: Banks Renewables.

7.5 MW
Capacity
as recorded in REPD
Operational
Status
since 24 April 2015
Wind Onshore
Technology
Banks Renewables
Lancaster
Authority
England

Planning and build timeline

Application submitted28 July 2011
Permission granted28 November 2012
16 months after submission
Operational24 April 2015
29 months after consent

Screening a site of your own?

RedlineUK · £39

Lancaster approves 80% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Heysham South Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Lancaster’s record on onshore wind

Lancaster has decided 5 onshore wind schemes and approved 80%, taking a median of 9.9 months. See every onshore wind scheme decision in Lancaster

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
1.50.6 km
Solar Photovoltaics · Operational
52.2 km
Solar Photovoltaics · Operational
6.23.1 km
Landfill Gas · Operational
23.1 km
Landfill Gas · Operational
43.1 km
Solar Photovoltaics · Operational
1.23.5 km
Solar Photovoltaics · Under Construction
16.54.6 km
Wind Onshore · Operational
26.4 km

How big is Heysham South Wind Farm?

Heysham South Wind Farm has a recorded installed capacity of 7.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Heysham South Wind Farm?

REPD records the operator as Banks Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Heysham South Wind Farm approved and built?

The application was submitted on 28 July 2011. Permission was granted on 28 November 2012, 16 months later. The site became operational on 24 April 2015, 29 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4174.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode