Novarly ParcelRenewable sites

Renewable sitesSalt Ayre

Salt Ayre

Salt Ayre is an operational 4 MW landfill gas site in Lancaster, generating since 22 March 2000. Planning permission was granted on 29 October 1999, 5 months after submission. Operator of record: Natural Power / SITA UK.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 22 March 2000
Landfill Gas
Technology
Natural Power / SITA UK
Lancaster
Authority
England

Planning and build timeline

Application submitted14 June 1999
Permission granted29 October 1999
5 months after submission
Operational22 March 2000
5 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Lancaster: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Salt Ayre’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
20 km
Solar Photovoltaics · Operational
52.9 km
Wind Onshore · Operational
7.53.1 km
Wind Onshore · Operational
1.53.2 km
Solar Photovoltaics · Operational
6.23.8 km
Solar Photovoltaics · Under Construction
16.54 km
Solar Photovoltaics · Operational
1.24 km
Wind Onshore · Operational
26.5 km

How big is Salt Ayre?

Salt Ayre has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Salt Ayre?

REPD records the operator as Natural Power / SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Salt Ayre approved and built?

The application was submitted on 14 June 1999. Permission was granted on 29 October 1999, 5 months later. The site became operational on 22 March 2000, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 748.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode