Renewable sites › Castle of Auchry Farm
Castle of Auchry Farm
Castle of Auchry Farm is an operational 2.4 MW onshore wind farm in Aberdeenshire, generating since 1 November 2013. Planning permission was granted on 14 August 2012, 31 months after submission. Operator of record: Green Cat Renewables.
Planning and build timeline
| Application submitted | 13 January 2010 |
| Permission granted | 14 August 2012 31 months after submission |
| Operational | 1 November 2013 15 months after consent |
Screening a site of your own?
Aberdeenshire approves 69% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Castle of Auchry Farm’s recorded coordinate — swap in your own postcode or coordinates.
Aberdeenshire’s record on onshore wind
Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 2.5 | 10.9 km |
Wind Onshore · Operational | 2 | 10.9 km |
Solar Photovoltaics · Operational | 1.8 | 11.2 km |
Wind Onshore · Operational | 9.6 | 12 km |
Battery · Under Construction | 49.9 | 14.2 km |
How big is Castle of Auchry Farm?
Castle of Auchry Farm has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Castle of Auchry Farm?
REPD records the operator as Green Cat Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Castle of Auchry Farm approved and built?
The application was submitted on 13 January 2010. Permission was granted on 14 August 2012, 31 months later. The site became operational on 1 November 2013, 15 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3718.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode