Renewable sites › Castle Combe Circuit
Castle Combe Circuit
Castle Combe Circuit is operational in Wiltshire with a recorded capacity of 12 MW, and has been generating since 2015-03-31.
Planning and build timeline
| Application submitted | 2014-07-16 |
| Permission granted | 2014-11-10 4 months after submission |
| Operational | 2015-03-31 5 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- National Landscape (AONB) — Cotswolds
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Wiltshire’s record on solar
Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Leigh Delamere - Solar farm & Battery storage Battery · Under Construction | 40 | 3.6 km |
Leigh Delamere - Solar farm & Battery storage Solar Photovoltaics · Under Construction | 49.9 | 3.6 km |
Battens Farm Solar Park Solar Photovoltaics · Operational | 11 | 3.9 km |
Hullavington Solar Park Solar Photovoltaics · Operational | 7 | 6.6 km |
Lake Farm Solar Photovoltaics · Operational | 5 | 8.8 km |
Manor Farm (Wiltshire) Solar Photovoltaics · Operational | 6.3 | 9.4 km |
Rodbourne Rail Farm - Solar Park Solar Photovoltaics · Operational | 7.6 | 11.1 km |
Wick Farm Melksham Substation Solar Photovoltaics · Under Construction | 49.9 | 11.2 km |
How big is Castle Combe Circuit?
Castle Combe Circuit has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Castle Combe Circuit?
REPD records the operator as Sunsave 17 / Vogt Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Castle Combe Circuit approved and built?
The application was submitted on 2014-07-16. Permission was granted on 2014-11-10, 4 months later. The site became operational on 2015-03-31, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1944.