Novarly ParcelRenewable sites

Renewable sitesCastle Combe Circuit

Castle Combe Circuit

Castle Combe Circuit is an operational 12 MW solar farm in Wiltshire, generating since 31 March 2015. Planning permission was granted on 10 November 2014, 4 months after submission. Operator of record: Sunsave 17 / Vogt Solar.

12 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2015
Solar Photovoltaics
Technology
Sunsave 17 / Vogt Solar
Wiltshire
Authority
England

Planning and build timeline

Application submitted16 July 2014
Permission granted10 November 2014
4 months after submission
Operational31 March 2015
5 months after consent

Screening a site of your own?

RedlineUK · £39

Wiltshire approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Castle Combe Circuit’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
49.93.6 km
Battery · Under Construction
403.6 km
Solar Photovoltaics · Operational
113.9 km
Solar Photovoltaics · Operational
76.6 km
Solar Photovoltaics · Operational
58.8 km
Solar Photovoltaics · Operational
6.39.4 km
Solar Photovoltaics · Operational
7.611.1 km
Battery · Under Construction
11.2 km

How big is Castle Combe Circuit?

Castle Combe Circuit has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Castle Combe Circuit?

REPD records the operator as Sunsave 17 / Vogt Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Castle Combe Circuit approved and built?

The application was submitted on 16 July 2014. Permission was granted on 10 November 2014, 4 months later. The site became operational on 31 March 2015, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1944.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode