Renewable sites › Carno 'A'and 'B' Wind Farm, (Extension)
Carno 'A'and 'B' Wind Farm, (Extension)
Carno 'A'and 'B' Wind Farm, (Extension) is an operational 15.6 MW onshore wind farm in Powys, generating since 1 March 2009. Planning permission was granted on 10 July 2006, 33 months after submission. Operator of record: RWE npower.
Planning and build timeline
| Application submitted | 10 October 2003 |
| Permission granted | 10 July 2006 33 months after submission |
| Operational | 1 March 2009 32 months after consent |
Screening a site of your own?
Powys approves 68% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Carno 'A'and 'B' Wind Farm, (Extension)’s recorded coordinate — swap in your own postcode or coordinates.
Powys’s record on onshore wind
Powys has decided 22 onshore wind schemes and approved 68%, taking a median of 36.8 months. See every onshore wind scheme decision in Powys →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 16.8 | 0 km |
Wind Onshore · Operational | 16.8 | 2.1 km |
Wind Onshore · Operational | 24.6 | 10.2 km |
Wind Onshore · Operational | 14.5 | 11 km |
Wind Onshore · Operational | 15.3 | 12.6 km |
Wind Onshore · Operational | 13.8 | 13.7 km |
Wind Onshore · Operational | 3.4 | 14.3 km |
How big is Carno 'A'and 'B' Wind Farm, (Extension)?
Carno 'A'and 'B' Wind Farm, (Extension) has a recorded installed capacity of 15.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Carno 'A'and 'B' Wind Farm, (Extension)?
REPD records the operator as RWE npower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Carno 'A'and 'B' Wind Farm, (Extension) approved and built?
The application was submitted on 10 October 2003. Permission was granted on 10 July 2006, 33 months later. The site became operational on 1 March 2009, 32 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3277.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode