Mynydd Clogau Wind Farm is an operational 14.5 MW onshore wind farm in Powys, generating since 1 December 2005. Planning permission was granted on 23 May 2002, 44 months after submission. Operator of record: Renewable Energy Systems (RES).

14.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2005
Wind Onshore
Technology
Renewable Energy Systems (RES)
Powys
Authority
Wales

Planning and build timeline

Application submitted11 September 1998
Permission granted23 May 2002
44 months after submission
Operational1 December 2005
42 months after consent

Screening a site of your own?

RedlineUK · £39

Powys approves 68% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Mynydd Clogau Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Powys’s record on onshore wind

Powys has decided 22 onshore wind schemes and approved 68%, taking a median of 36.8 months. See every onshore wind scheme decision in Powys

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
24.65 km
Wind Onshore · Operational
16.811 km
Wind Onshore · Operational
15.611 km
Wind Onshore · Operational
16.812.6 km

How big is Mynydd Clogau Wind Farm?

Mynydd Clogau Wind Farm has a recorded installed capacity of 14.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Mynydd Clogau Wind Farm?

REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Mynydd Clogau Wind Farm approved and built?

The application was submitted on 11 September 1998. Permission was granted on 23 May 2002, 44 months later. The site became operational on 1 December 2005, 42 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4684.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode