Bryn titli Windfarm is operational in Powys with a recorded capacity of 9.9 MW, and has been generating since 1994-06-01.

9.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1994-06-01
Wind Onshore
Technology
Innogy
Powys
Authority
Wales

Planning and build timeline

Application submitted1993-03-12
Permission granted1993-08-09
5 months after submission
Operational1994-06-01
10 months after consent

Powys’s record on onshore wind

Powys has decided 22 onshore wind schemes and approved 68%, taking a median of 36.8 months. See every onshore wind scheme decision in Powys

Other built sites within 15 km

SiteMWDistance
Bryn Blaen Wind Farm
Wind Onshore · Operational
13.86.1 km
Elan Valley Hydro Scheme
Small Hydro · Operational
2.98.7 km
Caban Coch
Small Hydro · Operational
1.19.1 km
Bryn Du
Wind Onshore · Operational
16.411 km
Llandinam Windfarm
Wind Onshore · Operational
3112.4 km
Cefn Croes Wind Farm
Wind Onshore · Operational
58.513.3 km

How big is Bryn titli Windfarm?

Bryn titli Windfarm has a recorded installed capacity of 9.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bryn titli Windfarm?

REPD records the operator as Innogy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bryn titli Windfarm approved and built?

The application was submitted on 1993-03-12. Permission was granted on 1993-08-09, 5 months later. The site became operational on 1994-06-01, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3015.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council