Renewable sites › Bryn Du
Bryn Du
Bryn Du is an operational 16.4 MW onshore wind farm in Powys, generating since 1 April 2005. Planning permission was granted on 10 December 2001, 17 months after submission. Operator of record: Renewable Development Company Ltd.
Planning and build timeline
| Application submitted | 24 July 2000 |
| Permission granted | 10 December 2001 17 months after submission |
| Operational | 1 April 2005 40 months after consent |
Screening a site of your own?
Powys approves 68% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Bryn Du’s recorded coordinate — swap in your own postcode or coordinates.
Powys’s record on onshore wind
Powys has decided 22 onshore wind schemes and approved 68%, taking a median of 36.8 months. See every onshore wind scheme decision in Powys →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 58.5 | 3.2 km |
Wind Onshore · Operational | 13.8 | 7.7 km |
Wind Onshore · Operational | 9.9 | 11 km |
Wind Onshore · Operational | 2.4 | 11.6 km |
Small Hydro · Operational | 2.9 | 14.8 km |
How big is Bryn Du?
Bryn Du has a recorded installed capacity of 16.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bryn Du?
REPD records the operator as Renewable Development Company Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bryn Du approved and built?
The application was submitted on 24 July 2000. Permission was granted on 10 December 2001, 17 months later. The site became operational on 1 April 2005, 40 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3556.