Renewable sites › Black Hill (Borders)
Black Hill (Borders)
Black Hill (Borders) is an operational 28.6 MW onshore wind farm in Scottish Borders, generating since 14 February 2007. Planning permission was granted on 2 July 2001, 5 months after submission. Operator of record: Renewable Energy Systems (RES).
Planning and build timeline
| Application submitted | 22 January 2001 |
| Permission granted | 2 July 2001 5 months after submission |
| Operational | 14 February 2007 67 months after consent |
Screening a site of your own?
Scottish Borders approves 56% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Black Hill (Borders)’s recorded coordinate — swap in your own postcode or coordinates.
Scottish Borders’s record on onshore wind
Scottish Borders has decided 41 onshore wind schemes and approved 56%, taking a median of 13.6 months. See every onshore wind scheme decision in Scottish Borders →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 29.9 | 9.1 km |
Wind Onshore · Operational | 62.5 | 10.4 km |
Wind Onshore · Operational | 81.7 | 10.6 km |
Wind Onshore · Operational | 2.4 | 11.8 km |
Wind Onshore · Operational | 138 | 12.7 km |
Wind Onshore · Operational | 28.7 | 12.9 km |
Wind Onshore · Operational | 1.5 | 12.9 km |
Wind Onshore · Under Construction | 48 | 13 km |
How big is Black Hill (Borders)?
Black Hill (Borders) has a recorded installed capacity of 28.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Black Hill (Borders)?
REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Black Hill (Borders) approved and built?
The application was submitted on 22 January 2001. Permission was granted on 2 July 2001, 5 months later. The site became operational on 14 February 2007, 67 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3574.