Belfast Harbour Estate

Belfast Harbour Estate is a 14.9 MW energy-from-waste plant under construction in Belfast. Planning permission was granted on 23 January 2014, 13 months after submission. Operator of record: Bombardier.

14.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
EfW Incineration
Technology
Bombardier
Belfast
Authority
Northern Ireland

Planning and build timeline

Application submitted19 December 2012
Permission granted23 January 2014
13 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Belfast: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Belfast Harbour Estate’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
1.20.8 km
Anaerobic Digestion · Operational
2.15.9 km
Solar Photovoltaics · Operational
3.86.8 km
Solar Photovoltaics · Operational
6.410.7 km
Landfill Gas · Operational
3.211.2 km
Wind Onshore · Operational
2.311.8 km
Wind Onshore · Operational
13.812.6 km
Battery · Operational
1013.7 km

How big is Belfast Harbour Estate?

Belfast Harbour Estate has a recorded installed capacity of 14.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Belfast Harbour Estate?

REPD records the operator as Bombardier. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Belfast Harbour Estate approved and built?

The application was submitted on 19 December 2012. Permission was granted on 23 January 2014, 13 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 957.