BH Energy - Biogas (AD) is an operational 2.1 MW anaerobic digestion plant in Lisburn and Castlereagh, generating since 4 April 2012. Planning permission was granted on 1 November 2010, 6 months after submission. Operator of record: Blakiston Houston Estate Company.

2.1 MW
Capacity
as recorded in REPD
Operational
Status
since 4 April 2012
Anaerobic Digestion
Technology
Blakiston Houston Estate Company
Lisburn and Castlereagh
Authority
Northern Ireland

Planning and build timeline

Application submitted10 May 2010
Permission granted1 November 2010
6 months after submission
Operational4 April 2012
17 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Lisburn and Castlereagh: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with BH Energy - Biogas (AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
1.25.5 km
EfW Incineration · Under Construction
14.95.9 km
Solar Photovoltaics · Operational
3.811.3 km
Battery · Operational
1011.8 km
Wind Onshore · Operational
13.814.8 km

How big is BH Energy - Biogas (AD)?

BH Energy - Biogas (AD) has a recorded installed capacity of 2.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates BH Energy - Biogas (AD)?

REPD records the operator as Blakiston Houston Estate Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was BH Energy - Biogas (AD) approved and built?

The application was submitted on 10 May 2010. Permission was granted on 1 November 2010, 6 months later. The site became operational on 4 April 2012, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 230.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode