Renewable sites › AES Kilroot Station Battery Storage Array
AES Kilroot Station Battery Storage Array
AES Kilroot Station Battery Storage Array is an operational 10 MW battery storage site in Mid and East Antrim, generating since 18 January 2016. REPD does not record the planning grant date. Operator of record: AES Kilroot Power (AES KPL).
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 18 January 2016 |
Screening a site of your own?
Redline runs the record on your own boundary in Mid and East Antrim: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with AES Kilroot Station Battery Storage Array’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 13.8 | 9.3 km |
Anaerobic Digestion · Operational | 2.1 | 11.8 km |
Solar Photovoltaics · Operational | 3.8 | 12.9 km |
Anaerobic Digestion · Operational | 1.2 | 12.9 km |
EfW Incineration · Under Construction | 14.9 | 13.7 km |
How big is AES Kilroot Station Battery Storage Array?
AES Kilroot Station Battery Storage Array has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates AES Kilroot Station Battery Storage Array?
REPD records the operator as AES Kilroot Power (AES KPL). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was AES Kilroot Station Battery Storage Array approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 18 January 2016.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6845.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode