Renewable sitesWind Turbine 1

Wind Turbine 1

Wind Turbine 1 is operational in Antrim and Newtownabbey with a recorded capacity of 2.3 MW, and has been generating since 2011-05-30.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-05-30
Wind Onshore
Technology
Brett Martin Ltd
Antrim and Newtownabbey
Authority
Northern Ireland

Planning and build timeline

Application submitted2009-06-02
Permission granted2010-02-15
8 months after submission
Operational2011-05-30
15 months after consent

Antrim and Newtownabbey’s record on onshore wind

Antrim and Newtownabbey has decided 19 onshore wind schemes and approved 79%, taking a median of 20.4 months. See every onshore wind scheme decision in Antrim and Newtownabbey

Other built sites within 15 km

SiteMWDistance
Cottonmount Quarry
Landfill Gas · Operational
3.20.7 km
Gibson Farm
Solar Photovoltaics · Operational
6.41.4 km
Bombardier Factory
Solar Photovoltaics · Operational
3.85.4 km
Carn Hill
Wind Onshore · Operational
13.88.5 km
Lands West of Belfast Road
Solar Photovoltaics · Operational
108.5 km
Elliot's Hill Wind Farm
Wind Onshore · Operational
58.6 km
Crookedstone Road
Solar Photovoltaics · Operational
4.811.7 km
Airport Road West
Anaerobic Digestion · Operational
1.211.7 km

How big is Wind Turbine 1?

Wind Turbine 1 has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wind Turbine 1?

REPD records the operator as Brett Martin Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wind Turbine 1 approved and built?

The application was submitted on 2009-06-02. Permission was granted on 2010-02-15, 8 months later. The site became operational on 2011-05-30, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2830.