Renewable sitesBeinn Tharsuinn Windfarm Project

Beinn Tharsuinn Windfarm Project

Beinn Tharsuinn Windfarm Project is operational in Highland with a recorded capacity of 29.8 MW, and has been generating since 2005-12-01.

29.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2005-12-01
Wind Onshore
Technology
CRE Energy/ Scottish Power
Highland
Authority
Scotland

Planning and build timeline

Application submitted2002-04-19
Permission granted2005-02-11
34 months after submission
Operational2005-12-01
10 months after consent

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Coire Na Cloiche Wind Farm
Wind Onshore · Operational
29.94.8 km
Beinn Tharsuinn Extension (Beinn nan Oighrean)
Wind Onshore · Operational
4.65.2 km
Meall an Tuirc Wind Farm
Wind Onshore · Operational
1712.1 km
Novar Wind Farm (Extension)
Wind Onshore · Operational
36.812.1 km
Bendealt Wind Farm, Highland
Wind Onshore · Operational
912.5 km
Alness Academy
Solar Photovoltaics · Under Construction
0.513.3 km

How big is Beinn Tharsuinn Windfarm Project?

Beinn Tharsuinn Windfarm Project has a recorded installed capacity of 29.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Beinn Tharsuinn Windfarm Project?

REPD records the operator as CRE Energy/ Scottish Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Beinn Tharsuinn Windfarm Project approved and built?

The application was submitted on 2002-04-19. Permission was granted on 2005-02-11, 34 months later. The site became operational on 2005-12-01, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4669.