Barton Close Farm is operational in North Devon with a recorded capacity of 5.5 MW, and has been generating since 2016-02-15.

5.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-02-15
Solar Photovoltaics
Technology
British Solar Renewables
North Devon
Authority
England

Planning and build timeline

Application submitted2012-10-04
Permission granted2014-04-15
18 months after submission
Operational2016-02-15
22 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Devon’s record on solar

North Devon has decided 23 solar farms and approved 96%, taking a median of 4.9 months. See every solar farm decision in North Devon

Other built sites within 15 km

SiteMWDistance
Blatchworthy Farm
Solar Photovoltaics · Operational
1.52.7 km
West Hill Farm (solar)
Solar Photovoltaics · Operational
7.32.7 km
West Hill Farm
Solar Photovoltaics · Operational
2.43 km
Fullabrook Down Wind Farm
Wind Onshore · Operational
665 km
Luscott Barton
Solar Photovoltaics · Operational
136.1 km
Pall Europe Building
Solar Photovoltaics · Operational
0.586.1 km
Exeter Road, Braunton - Solar Panels
Solar Photovoltaics · Under Construction
0.756.5 km
Perrigo,Wrafton - Solar Photovoltaic System
Solar Photovoltaics · Operational
0.536.5 km

How big is Barton Close Farm?

Barton Close Farm has a recorded installed capacity of 5.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Barton Close Farm?

REPD records the operator as British Solar Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Barton Close Farm approved and built?

The application was submitted on 2012-10-04. Permission was granted on 2014-04-15, 18 months later. The site became operational on 2016-02-15, 22 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1864.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council