Renewable sitesBarkip Landfill Site

Barkip Landfill Site

Barkip Landfill Site is an operational 1.2 MW landfill gas site in North Ayrshire, generating since 13 October 2004. Planning permission was granted on 21 January 2004, 4 months after submission. Operator of record: William Tracey Ltd.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 13 October 2004
Landfill Gas
Technology
William Tracey Ltd
North Ayrshire
Authority
Scotland

Planning and build timeline

Application submitted1 October 2003
Permission granted21 January 2004
4 months after submission
Operational13 October 2004
9 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Ayrshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Barkip Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
2.20 km
Wind Onshore · Operational
183.8 km
Wind Onshore · Operational
6.44.4 km
Wind Onshore · Operational
184.5 km
Solar Photovoltaics · Operational
56.9 km
Wind Onshore · Operational
287 km
Wind Onshore · Under Construction
97.5 km
Wind Onshore · Operational
69.9 km

How big is Barkip Landfill Site?

Barkip Landfill Site has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Barkip Landfill Site?

REPD records the operator as William Tracey Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Barkip Landfill Site approved and built?

The application was submitted on 1 October 2003. Permission was granted on 21 January 2004, 4 months later. The site became operational on 13 October 2004, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 682.