Renewable sitesArdrossan Extension

Ardrossan Extension

Ardrossan Extension is operational in North Ayrshire with a recorded capacity of 6 MW, and has been generating since 2008-11-01.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 2008-11-01
Wind Onshore
Technology
Airtricity
North Ayrshire
Authority
Scotland

Planning and build timeline

Application submitted2005-12-01
Permission granted2007-11-26
24 months after submission
Operational2008-11-01
11 months after consent

North Ayrshire’s record on onshore wind

North Ayrshire has decided 18 onshore wind schemes and approved 78%, taking a median of 8.5 months. See every onshore wind scheme decision in North Ayrshire

Other built sites within 15 km

SiteMWDistance
Ardrossan
Wind Onshore · Operational
240 km
Sorbie Farm
Wind Onshore · Under Construction
92.4 km
Site To North East Of, Lochcraigs Farm
Solar Photovoltaics · Operational
54.2 km
Wardlaw Wood
Wind Onshore · Operational
188.8 km
Nethermains - Solar Farm
Solar Photovoltaics · Under Construction
7.59 km
Millour Hill Community Windfarm
Wind Onshore · Operational
189.9 km
Barkip Landfill Site
Landfill Gas · Operational
1.29.9 km
Barkip Anaerobic Digestor (Waste AD)
Anaerobic Digestion · Operational
2.29.9 km

How big is Ardrossan Extension?

Ardrossan Extension has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ardrossan Extension?

REPD records the operator as Airtricity. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ardrossan Extension approved and built?

The application was submitted on 2005-12-01. Permission was granted on 2007-11-26, 24 months later. The site became operational on 2008-11-01, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4668.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council