Baillie Wind Farm
Baillie Wind Farm is an operational 52.5 MW onshore wind farm in Scotland, generating since 29 March 2013. Planning permission was granted on 12 January 2010, 66 months after submission. Operator of record: Baillie Windfarm Ltd.
Planning and build timeline
| Application submitted | 13 July 2004 |
| Permission granted | 12 January 2010 66 months after submission |
| Operational | 29 March 2013 39 months after consent |
Screening a site of your own?
Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Baillie Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Scottish Government (S36)’s record on onshore wind
Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36) →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 1.5 | 3.7 km |
Wind Onshore · Operational | 5.2 | 3.9 km |
Wind Onshore · Operational | 4.9 | 3.9 km |
Wind Onshore · Operational | 2.6 | 3.9 km |
Battery · Under Construction | 34 | 4.3 km |
Wind Onshore · Operational | 21 | 4.9 km |
Battery · Operational | 5 | 4.9 km |
Wind Onshore · Operational | 79.8 | 5.8 km |
How big is Baillie Wind Farm?
Baillie Wind Farm has a recorded installed capacity of 52.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Baillie Wind Farm?
REPD records the operator as Baillie Windfarm Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Baillie Wind Farm approved and built?
The application was submitted on 13 July 2004. Permission was granted on 12 January 2010, 66 months later. The site became operational on 29 March 2013, 39 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4021.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode