Forss Wind Farm
Forss Wind Farm is an operational 2.6 MW onshore wind farm in Highland, generating since 1 July 2003. REPD does not record the planning grant date. Operator of record: Renewable Energy Systems (RES).
Planning and build timeline
| Application submitted | 12 January 2001 |
| Permission granted | not recorded |
| Operational | 1 July 2003 |
Screening a site of your own?
Highland approves 63% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Forss Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Highland’s record on onshore wind
Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 4.9 | 0 km |
Wind Onshore · Operational | 5.2 | 0 km |
Wind Onshore · Operational | 1.5 | 0.5 km |
Wind Onshore · Operational | 52.5 | 3.9 km |
Battery · Under Construction | 34 | 5.3 km |
Wind Onshore · Operational | 21 | 8.4 km |
Battery · Operational | 5 | 8.4 km |
Wind Onshore · Operational | 79.8 | 8.8 km |
How big is Forss Wind Farm?
Forss Wind Farm has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Forss Wind Farm?
REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Forss Wind Farm approved and built?
The application was submitted on 12 January 2001. REPD does not record a grant date. The site became operational on 1 July 2003.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6636.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode