Hill of Lybster

Hill of Lybster is operational in Highland with a recorded capacity of 4.9 MW, and has been generating since 2003-02-08.

4.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2003-02-08
Wind Onshore
Technology
Fivestone Ltd (subsidiary of Abbey Produce)
Highland
Authority
Scotland

Planning and build timeline

Application submitted2000-04-28
Permission granted2001-06-22
14 months after submission
Operational2003-02-08
20 months after consent

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Forss Wind Farm
Wind Onshore · Operational
2.60 km
Forss Wind Farm (Extension)
Wind Onshore · Operational
5.20 km
Hill of Lybster (Wind Turbine - Extension)
Wind Onshore · Operational
1.50.5 km
Baillie Wind Farm
Wind Onshore · Operational
52.53.9 km
Dounreay, Thurso - Battery Energy Storage
Battery · Under Construction
345.3 km
Limekiln Wind Farm (Extension)
Wind Onshore · Operational
218.4 km
Limekiln Wind Farm (Extension) - Battery
Battery · Operational
58.4 km
Limekiln Wind Farm
Wind Onshore · Operational
79.88.8 km

How big is Hill of Lybster?

Hill of Lybster has a recorded installed capacity of 4.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hill of Lybster?

REPD records the operator as Fivestone Ltd (subsidiary of Abbey Produce). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hill of Lybster approved and built?

The application was submitted on 2000-04-28. Permission was granted on 2001-06-22, 14 months later. The site became operational on 2003-02-08, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3309.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council