Novarly ParcelRenewable sites

Renewable sitesArmistead Wind Farm

Armistead Wind Farm

Armistead Wind Farm is operational in Westmorland and Furness with a recorded capacity of 12 MW, and has been generating since 2013-02-11.

12 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-02-11
Wind Onshore
Technology
Banks Renewables
Westmorland and Furness
Authority
England

Planning and build timeline

Application submitted2008-03-25
Permission granted2010-07-15
28 months after submission
Operational2013-02-11
31 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Westmorland and Furness’s record on onshore wind

Westmorland and Furness has decided 17 onshore wind schemes and approved 35%, taking a median of 16.8 months. See every onshore wind scheme decision in Westmorland and Furness

Other built sites within 15 km

SiteMWDistance
Greaves Solar Farm
Solar Photovoltaics · Operational
53.2 km
Lambrigg Wind Farm
Wind Onshore · Operational
6.56.7 km
Murley Moss - Additional Solar Design And Build
Solar Photovoltaics · Under Construction
7.4 km
South Stilling Tanks Solar Farm
Solar Photovoltaics · Operational
0.511.5 km
Burneside Mill, Burneside
Solar Photovoltaics · Operational
112 km
Burneside Mill Solar Array - Phase 3
Solar Photovoltaics · Operational
0.312 km
Burneside Mill
Solar Photovoltaics · Operational
0.512 km

How big is Armistead Wind Farm?

Armistead Wind Farm has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Armistead Wind Farm?

REPD records the operator as Banks Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Armistead Wind Farm approved and built?

The application was submitted on 2008-03-25. Permission was granted on 2010-07-15, 28 months later. The site became operational on 2013-02-11, 31 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3986.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council