Renewable sites › South Stilling Tanks Solar Farm
South Stilling Tanks Solar Farm
South Stilling Tanks Solar Farm is an operational 0.5 MW solar farm in Westmorland and Furness, generating since 16 December 2021. Planning permission was granted on 14 April 2021, 7 months after submission. Operator of record: Ellergreen Energy.
Planning and build timeline
| Application submitted | 6 September 2020 |
| Permission granted | 14 April 2021 7 months after submission |
| Operational | 16 December 2021 8 months after consent |
Screening a site of your own?
Westmorland and Furness approves 85% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with South Stilling Tanks Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Westmorland and Furness’s record on solar
Westmorland and Furness has decided 39 solar farms and approved 85%, taking a median of 3.8 months. See every solar farm decision in Westmorland and Furness →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 0.3 | 0.5 km |
Solar Photovoltaics · Operational | 1 | 0.5 km |
Solar Photovoltaics · Operational | 0.5 | 0.5 km |
Solar Photovoltaics · Under Construction | — | 4.8 km |
Wind Onshore · Operational | 6.5 | 8.2 km |
Solar Photovoltaics · Operational | 5 | 8.8 km |
Wind Onshore · Operational | 12 | 11.5 km |
How big is South Stilling Tanks Solar Farm?
South Stilling Tanks Solar Farm has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates South Stilling Tanks Solar Farm?
REPD records the operator as Ellergreen Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was South Stilling Tanks Solar Farm approved and built?
The application was submitted on 6 September 2020. Permission was granted on 14 April 2021, 7 months later. The site became operational on 16 December 2021, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8141.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode