Novarly ParcelRenewable sites

Renewable sitesBurneside Mill, Burneside

Burneside Mill, Burneside

Burneside Mill, Burneside is an operational 1 MW solar farm in Westmorland and Furness, generating since 15 June 2021. Planning permission was granted on 30 April 2021, 3 months after submission. Operator of record: Burenside Community Energy Limited.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 15 June 2021
Solar Photovoltaics
Technology
Burenside Community Energy Limited
Westmorland and Furness
Authority
England

Planning and build timeline

Application submitted3 February 2021
Permission granted30 April 2021
3 months after submission
Operational15 June 2021
2 months after consent

Screening a site of your own?

RedlineUK · £39

Westmorland and Furness approves 85% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Burneside Mill, Burneside’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Westmorland and Furness’s record on solar

Westmorland and Furness has decided 39 solar farms and approved 85%, taking a median of 3.8 months. See every solar farm decision in Westmorland and Furness

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.30 km
Solar Photovoltaics · Operational
0.50.1 km
Solar Photovoltaics · Operational
0.50.5 km
Solar Photovoltaics · Under Construction
5.3 km
Wind Onshore · Operational
6.58.5 km
Solar Photovoltaics · Operational
59.3 km
Wind Onshore · Operational
1212 km

How big is Burneside Mill, Burneside?

Burneside Mill, Burneside has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Burneside Mill, Burneside?

REPD records the operator as Burenside Community Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Burneside Mill, Burneside approved and built?

The application was submitted on 3 February 2021. Permission was granted on 30 April 2021, 3 months later. The site became operational on 15 June 2021, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8440.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode