Renewable sites › Murley Moss - Additional Solar Design And Build
Murley Moss - Additional Solar Design And Build
Murley Moss - Additional Solar Design And Build is under construction in Westmorland and Furness.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Westmorland and Furness’s record on solar
Westmorland and Furness has decided 39 solar farms and approved 85%, taking a median of 3.8 months. See every solar farm decision in Westmorland and Furness →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Greaves Solar Farm Solar Photovoltaics · Operational | 5 | 4.3 km |
South Stilling Tanks Solar Farm Solar Photovoltaics · Operational | 0.5 | 4.8 km |
Burneside Mill Solar Array - Phase 3 Solar Photovoltaics · Operational | 0.3 | 5.3 km |
Burneside Mill, Burneside Solar Photovoltaics · Operational | 1 | 5.3 km |
Burneside Mill Solar Photovoltaics · Operational | 0.5 | 5.4 km |
Lambrigg Wind Farm Wind Onshore · Operational | 6.5 | 7.1 km |
Armistead Wind Farm Wind Onshore · Operational | 12 | 7.4 km |
How big is Murley Moss - Additional Solar Design And Build?
REPD does not record an installed capacity for Murley Moss - Additional Solar Design And Build.
Who operates Murley Moss - Additional Solar Design And Build?
REPD records the operator as Lake District National Park. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Murley Moss - Additional Solar Design And Build approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 19238.