Novarly ParcelRenewable sites

Renewable sitesMurley Moss - Additional Solar Design And Build

Murley Moss - Additional Solar Design And Build

Murley Moss - Additional Solar Design And Build is under construction in Westmorland and Furness.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Lake District National Park
Westmorland and Furness
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Westmorland and Furness’s record on solar

Westmorland and Furness has decided 39 solar farms and approved 85%, taking a median of 3.8 months. See every solar farm decision in Westmorland and Furness

Other built sites within 15 km

SiteMWDistance
Greaves Solar Farm
Solar Photovoltaics · Operational
54.3 km
South Stilling Tanks Solar Farm
Solar Photovoltaics · Operational
0.54.8 km
Burneside Mill Solar Array - Phase 3
Solar Photovoltaics · Operational
0.35.3 km
Burneside Mill, Burneside
Solar Photovoltaics · Operational
15.3 km
Burneside Mill
Solar Photovoltaics · Operational
0.55.4 km
Lambrigg Wind Farm
Wind Onshore · Operational
6.57.1 km
Armistead Wind Farm
Wind Onshore · Operational
127.4 km

How big is Murley Moss - Additional Solar Design And Build?

REPD does not record an installed capacity for Murley Moss - Additional Solar Design And Build.

Who operates Murley Moss - Additional Solar Design And Build?

REPD records the operator as Lake District National Park. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Murley Moss - Additional Solar Design And Build approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 19238.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council