Novarly ParcelRenewable sites

Renewable sitesBrooks Farm Solar Park

Brooks Farm Solar Park

Brooks Farm Solar Park is an operational 8 MW solar farm in Cherwell, generating since 28 March 2015. Planning permission was granted on 5 September 2014, 3 months after submission. Operator of record: Green Energy UK Direct Ltd.

8 MW
Capacity
as recorded in REPD
Operational
Status
since 28 March 2015
Solar Photovoltaics
Technology
Green Energy UK Direct Ltd
Cherwell
Authority
England

Planning and build timeline

Application submitted13 June 2014
Permission granted5 September 2014
3 months after submission
Operational28 March 2015
7 months after consent

Screening a site of your own?

RedlineUK · £39

Cherwell approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Brooks Farm Solar Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cherwell’s record on solar

Cherwell has decided 36 solar farms and approved 100%, taking a median of 2.4 months. See every solar farm decision in Cherwell

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
0.4 km
Solar Photovoltaics · Under Construction
190.4 km
Solar Photovoltaics · Operational
18.31.5 km
Solar Photovoltaics · Operational
12.53.8 km
Solar Photovoltaics · Under Construction
0.64.5 km
Solar Photovoltaics · Operational
136.6 km
EfW Incineration · Operational
247.4 km
Anaerobic Digestion · Operational
210.6 km

How big is Brooks Farm Solar Park?

Brooks Farm Solar Park has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brooks Farm Solar Park?

REPD records the operator as Green Energy UK Direct Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brooks Farm Solar Park approved and built?

The application was submitted on 13 June 2014. Permission was granted on 5 September 2014, 3 months later. The site became operational on 28 March 2015, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2307.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode