Novarly ParcelRenewable sites

Renewable sitesHome Farm (Merton - solar)

Home Farm (Merton - solar)

Home Farm (Merton - solar) is operational in Cherwell with a recorded capacity of 18.3 MW, and has been generating since 2013-11-12.

18.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-11-12
Solar Photovoltaics
Technology
R S Assemblies Limited
Cherwell
Authority
England

Planning and build timeline

Application submitted2012-10-26
Permission granted2013-02-15
4 months after submission
Operational2013-11-12
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cherwell’s record on solar

Cherwell has decided 36 solar farms and approved 100%, taking a median of 2.4 months. See every solar farm decision in Cherwell

Other built sites within 15 km

SiteMWDistance
Brooks Farm Solar Park
Solar Photovoltaics · Operational
81.5 km
Ray Valley Solar Farm
Battery · Under Construction
1.8 km
Ray Valley Solar Farm
Solar Photovoltaics · Under Construction
191.8 km
New Stone House
Solar Photovoltaics · Operational
12.52.7 km
Tesco Superstore Bicester
Solar Photovoltaics · Under Construction
0.63.1 km
Rowles Farm solar park
Solar Photovoltaics · Operational
136.1 km
Ardley EfW
EfW Incineration · Operational
246.2 km
Ardley Fields Farm Landfill Site
Landfill Gas · Operational
1.89.8 km

How big is Home Farm (Merton - solar)?

Home Farm (Merton - solar) has a recorded installed capacity of 18.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Home Farm (Merton - solar)?

REPD records the operator as R S Assemblies Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Home Farm (Merton - solar) approved and built?

The application was submitted on 2012-10-26. Permission was granted on 2013-02-15, 4 months later. The site became operational on 2013-11-12, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1721.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council