Alan Bartlett & Sons Solar is operational in Fenland with a recorded capacity of 1.2 MW, and has been generating since 2013-03-31.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-03-31
Solar Photovoltaics
Technology
Alan Bartlett & Sons Ltd
Fenland
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2013-03-31

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Fenland’s record on solar

Fenland has decided 22 solar farms and approved 91%, taking a median of 2.8 months. See every solar farm decision in Fenland

Other built sites within 15 km

SiteMWDistance
Land East Of Honeysome Road
Solar Photovoltaics · Operational
4.60.6 km
Mepal CHP
Anaerobic Digestion · Operational
14.44.2 km
Red Tile
Wind Onshore · Operational
245.1 km
Asksham Community Village Solar Farm
Solar Photovoltaics · Under Construction
0.155.6 km
Ranson Moor Wind Farm (Phase 2)
Wind Onshore · Operational
46.6 km
Ranson Moor (phase 1)
Wind Onshore · Operational
66.9 km
Greenvale AP Wind Turbine
Wind Onshore · Operational
1.58.3 km
Elean Business Park Biomass Plant
Biomass (dedicated) · Operational
408.6 km

How big is Alan Bartlett & Sons Solar?

Alan Bartlett & Sons Solar has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Alan Bartlett & Sons Solar?

REPD records the operator as Alan Bartlett & Sons Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Alan Bartlett & Sons Solar approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2013-03-31.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1085.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council