Novarly ParcelRenewable sites

Renewable sitesWinnards Perch Solar Farm

Winnards Perch Solar Farm

Winnards Perch Solar Farm is operational in Cornwall with a recorded capacity of 3.8 MW, and has been generating since 2013-07-31.

3.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-07-31
Solar Photovoltaics
Technology
Solar Securities Group
Cornwall
Authority
England

Planning and build timeline

Application submitted2012-06-13
Permission granted2012-10-26
4 months after submission
Operational2013-07-31
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on solar

Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Bears Down Wind Farm
Wind Onshore · Operational
9.82.7 km
Denzell Downs Wind Farm
Wind Onshore · Operational
103 km
Trelow Farm
Solar Photovoltaics · Operational
1.63.1 km
St Columb Major Solar Farm
Solar Photovoltaics · Operational
74.4 km
Trenouth Farm
Solar Photovoltaics · Operational
3.64.6 km
Hawksland Solar
Solar Photovoltaics · Operational
3.14.9 km
Kernow Solar Farm
Solar Photovoltaics · Operational
57.1 km
Middle Treworder Farm
Solar Photovoltaics · Operational
57.1 km

How big is Winnards Perch Solar Farm?

Winnards Perch Solar Farm has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Winnards Perch Solar Farm?

REPD records the operator as Solar Securities Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Winnards Perch Solar Farm approved and built?

The application was submitted on 2012-06-13. Permission was granted on 2012-10-26, 4 months later. The site became operational on 2013-07-31, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2348.