Novarly ParcelRenewable sites

Renewable sitesWest of Duddon Sands

West of Duddon Sands

West of Duddon Sands is an operational 389 MW offshore wind farm in DECC (S36), generating since 30 October 2014. Planning permission was granted on 4 September 2008, 29 months after submission. Operator of record: Scottish Power Renewables & Orsted (formerly Dong Energy).

389 MW
Capacity
as recorded in REPD
Operational
Status
since 30 October 2014
Wind Offshore
Technology
Scottish Power Renewables & Orsted (formerly Dong Energy)
DECC (S36)
Authority
England

Planning and build timeline

Application submitted1 April 2006
Permission granted4 September 2008
29 months after submission
Operational30 October 2014
74 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in DECC (S36): the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with West of Duddon Sands’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Offshore · Operational
183.67 km
Wind Offshore · Operational
9010.8 km
Wind Offshore · Operational
15011.6 km
Wind Offshore · Operational
183.614.3 km

How big is West of Duddon Sands?

West of Duddon Sands has a recorded installed capacity of 389 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates West of Duddon Sands?

REPD records the operator as Scottish Power Renewables & Orsted (formerly Dong Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was West of Duddon Sands approved and built?

The application was submitted on 1 April 2006. Permission was granted on 4 September 2008, 29 months later. The site became operational on 30 October 2014, 74 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2519.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode