Walney�2 is operational in DECC (S36) with a recorded capacity of 183.6 MW, and has been generating since 2012-04-06.

183.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-04-06
Wind Offshore
Technology
Orsted (formerly Dong Energy)
DECC (S36)
Authority
England

Planning and build timeline

Application submitted2006-03-31
Permission granted2007-11-07
19 months after submission
Operational2012-04-06
53 months after consent

Other built sites within 15 km

SiteMWDistance
Walney�1
Wind Offshore · Operational
183.67.6 km
Walney 3
Wind Offshore · Operational
6598.6 km
Ormonde Offshore
Wind Offshore · Operational
15011.2 km
West of Duddon Sands
Wind Offshore · Operational
38914.3 km

How big is Walney�2?

Walney�2 has a recorded installed capacity of 183.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Walney�2?

REPD records the operator as Orsted (formerly Dong Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Walney�2 approved and built?

The application was submitted on 2006-03-31. Permission was granted on 2007-11-07, 19 months later. The site became operational on 2012-04-06, 53 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2506.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council