Renewable sites › Land At Rymes Farm (Phase 2)/Grange Solar Farm
Land At Rymes Farm (Phase 2)/Grange Solar Farm
Land At Rymes Farm (Phase 2)/Grange Solar Farm is an operational 6.8 MW solar farm in Forest of Dean, generating since 15 November 2015. Planning permission was granted on 12 June 2015, 6 months after submission. Operator of record: Solar Century (TGC Renewables).
Planning and build timeline
| Application submitted | 23 December 2014 |
| Permission granted | 12 June 2015 6 months after submission |
| Operational | 15 November 2015 5 months after consent |
Screening a site of your own?
Forest of Dean approves 76% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Land At Rymes Farm (Phase 2)/Grange Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Forest of Dean’s record on solar
Forest of Dean has decided 25 solar farms and approved 76%, taking a median of 3.1 months. See every solar farm decision in Forest of Dean →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 6.9 | 0.2 km |
Battery · Operational | — | 2.4 km |
Solar Photovoltaics · Operational | 49.9 | 2.4 km |
Solar Photovoltaics · Operational | 0.5 | 6.1 km |
Solar Photovoltaics · Operational | 1.4 | 9.6 km |
Solar Photovoltaics · Operational | 5 | 11.1 km |
Solar Photovoltaics · Operational | — | 11.8 km |
Biomass (dedicated) · Operational | 2.1 | 13.8 km |
How big is Land At Rymes Farm (Phase 2)/Grange Solar Farm?
Land At Rymes Farm (Phase 2)/Grange Solar Farm has a recorded installed capacity of 6.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land At Rymes Farm (Phase 2)/Grange Solar Farm?
REPD records the operator as Solar Century (TGC Renewables). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land At Rymes Farm (Phase 2)/Grange Solar Farm approved and built?
The application was submitted on 23 December 2014. Permission was granted on 12 June 2015, 6 months later. The site became operational on 15 November 2015, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4943.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode